Need Help?

Join The Community

20 Days
Antminer Bitcoin Miner S21 Hyd 20Days
BTC-Activity
Service Fee
The service fee refers to the operation and maintenance expenses incurred by 1024Mining to ensure the stable operation of the mining machine.
$0.0218/TH/Days
Hashrate fee
Cloud computing power fees refer to the fees paid when purchasing computing power through cloud services.
$0.0149/TH/Days
Sold 30%
$14.74
$17.36
Buy Now
Handshake
cuts are complete.
Days
Hours
Minutes
Seconds
Estimated date of reward launch:
26 April 2023, 12:00 UTC
170,000
event block height
185,461
current block height
676.0
block time
BTC 4.67e-7
Trading price
HNS 8.29 m
total market
422.346 m
difficulty

Monero (XMR) Hard Fork Event

Monero has confirmed the date of the network upgrade, also known as the hard fork event. This fork will occur around July 16, 2022 , at block height 2668888. This is the fifteenth upgrade of Monero, also known as Upgraded for the v15 Monero network.

This upgrade focuses on privacy and performance, including:

  • The ring size was increased from 11 to 16, a move that increases the total number of anonymous “signers” per transaction.
  • Bulletproof+ , which will make the encryption and verification process on the blockchain faster, reduce the size of the transaction and increase the verification performance by 5% to 7%.
  • Multi-signature mechanism fixes.
  • Reform of fee mechanism and improve network security.

As a 1024 Mining user, do I need to do anything after the Monero fork?

No, 1024 Mining will take care of whatever needs to be done, you don’t need to do anything.

As a Monero user, is there anything I need to do after the Monero fork?

If you use a self-hosted wallet/node, you will need to update the corresponding software, if not, no action, your wallet service provider will do this for you.

en_USEnglish
Scroll to Top